Prepare final layout and flow sheet based on the main machinery selected and approved preliminary layout and flow sheet. |
• |
Review and approve the General arrangement drawings prepared by the equipment / machinery suppliers for various process departments to coordinate and to ensure that they meet all the requirements as laid down in the respective specifications including chutes etc., |
• |
Participation in the meetings with the customer, main equipment suppliers, Auxiliary equipment suppliers. |
• |
Preparation of general arrangement of drawings between the departments uncovered in the equipment supplier scope and the interconnecting/hook-up drawings as required for the completion of engineering properly as a whole. |
• |
Review and scrutinize of compressed air supply system drawings including bill of materials required for the plant operation |
• |
Coordination with the drawings supplied by the various equipment suppliers and to see that all the necessary drawings required for project are supplied. |
• |
Preparation of tender documents giving the specifications, General conditions of contract, special conditions of contract – etc., and invite the bidders for finalizing the fabrication and erection contractor. |
• |
Evaluate the bids received and prepare the comparative statement and assisting in selection of the tenderer. |
• |
Review the load data, anchor plan and other engineering data supplied by the equipment supplier. |
• |
Review and scrutinize of drawings for the submission to factory Inspectorate and authorities for their approval. |
• |
Review and scrutinize of as built drawings incorporating the site instructions and submissions of the same. |